Funding our own loans since 2004 $20,000 to $5,000,000 Funded in as little as 24 hours No repayments for 6 months
HomeSec Business Finance
Video · 1:14

When the builder collapses halfway through the build

1:14 · Posted 8 October 2025 on the HomeSec YouTube channel

Paul Stone on a client in Tasmania whose builder collapsed halfway through a large indoor equestrian centre, with a contract depending on the building being finished, and how HomeSec funded the finish after the banks declined.

In short
  • When a builder fails mid-project, the owner is left with a half-finished building, money already paid, and a replacement builder to find and fund.
  • In Paul's story, a contract to sell water collected off the finished roof depended on completion, so the delay itself was the threat.
  • The banks declined it as too unusual and too risky. HomeSec assessed the property and what finishing the building would unlock.
  • The completed building and the contract behind it were the way out of the loan.

What happened

Paul tells the story of a client in Tasmania building a very large indoor equestrian centre. Halfway through, the building company collapsed and the builder was gone. The owner was left with a half-finished structure, no cash to finish it, and a deadline that mattered: buyers were lined up for the rainwater the huge roof would collect, and that contract would fall over if the building was not completed. The banks declined it as too unusual and too risky. Paul flew to Burnie the same day, walked through the half-built barn, and the funds were in the client's account the next afternoon. The centre was finished and the water contract went ahead.

Why the banks walked away

A partly built project is hard for a bank. Until it is finished the building is worth less than its cost, a failed builder adds uncertainty about defects and missing work, and a specialised building is one a bank cannot easily price or resell. Each of those reads as risk, and together they usually mean a decline or a long wait. A lender that looks at the equity in property and at what completion unlocks can reach a different answer.

First steps if your builder has gone under

  1. Find out who is in charge now. An administrator or liquidator controls the builder's affairs. Contact them about the contract, materials on site and any money held.
  2. Secure the site and record it. Photograph what has been built, list materials on site, and keep every invoice and payment record.
  3. Get a price to complete. A replacement builder's quote, fixed if possible. The gap between that and what is left in the budget is the amount that has to be found.
  4. Check for insurance. For a home, a home warranty or domestic building insurance policy may respond. Commercial and investment projects rarely have an equivalent.
  5. Name the exit. A sale, a lease, a contract that starts on completion, or a bank refinance once the building is finished and easier to value.

How funding to finish works

The loan is secured on Australian real property: the project itself if there is enough equity in it, or another property such as the owner's home or an investment property, up to 80% of residential value or 70% of commercial value, less what is owed. There are no financial statements to produce. The term is open, so the loan runs until the building is finished and the exit arrives, and it can be repaid then without a penalty. The written guide to business bridging loans covers this kind of bridge, from a gap you can see the end of to the money that closes it.

Questions people ask next

Will a lender fund a half-finished building?
Many will not, because an unfinished building is worth less than a completed one and is harder to sell. HomeSec assesses the equity in the property as it stands, plus any other property offered, and the exit that finishing the project makes possible. The security does not have to be the building site itself.
Can the loan pay a replacement builder?
Yes. Finishing a commercial or investment project with a new builder is a business purpose. Most owners borrow the cost to complete once a replacement builder has priced it, so they know the figure before they borrow rather than finding out halfway through.
What happens to the money I already paid the builder?
It becomes a claim in the builder's liquidation or administration. Unsecured creditors are paid last, often only part of what they are owed and usually after many months. Plan the finish on the basis that the money will not come back in time, and treat anything recovered later as a way to pay the loan down.
The full guide

The video is the short version. The written guide has the detail: business bridging loans.

To talk it through about your own property, ring a Lending Manager on 1300 93 83 87, Mon–Fri, 8:30am – 5:30pm Melbourne time.

More videos

Sixty seconds, no documents

See if you qualify in sixty seconds

Three short questions, no credit check to apply and no financial statements. A Lending Manager reads it and calls you back with a real answer — not a call centre, not an algorithm.

That's the HomeSec Advantage.

See if you qualify Call 1300 93 83 87 Mon–Fri, 8:30am – 5:30pm Melbourne time

Reviewed by Jason Brockmuller, Joint Chief Executive

1300 93 83 87 homesec.com.au
Get funded Call 1300 93 83 87

Before you go — $20,000 to $5,000,000 against property equity

Business funds can be available in as little as 24 hours — with no payments for up to 6 months.

First and second mortgages. No financials, no cashflow records and no sworn valuation needed. Every application is subject to assessment and approval.

See if you qualify

Or talk to a Lending Manager on 1300 93 83 87, Mon–Fri, 8:30am – 5:30pm Melbourne time.